Doing Business with Orpic

Orpic facilitates sustainable supply chain of qualified and competitive partners and service providers through efficient processes and initiatives. These include our Tawreed portal to streamline our supplier registration process, and our user-friendly enquiry and NOC service for contractors and subcontractors as well as our code of business conduct to help our partners meet our expectations.

NOC Requests

Orpic accepts requests for No Objection Certificates in two categories:

*Note: Non SIPC (Sohar Industrial Port Company)
MSCP/MSPP

New NOC Requests NOC Renewals

New NOC Requests

For new NOC requests, please provide the required information in the following checklist:

Item Description Y N N/A Remarks
1.

NOC Required

(a) Engineering Phase
One-time issue
(b) Project Phase
Renewal basis

Mandatory
2.

Application Letter available along with Client letter

Mandatory
3.

M.O.G. Letter available

In case o
Non-SIPC
4.

Chainage and Alignment details available

 
5.

Proposed Construction / Modification / Crossing detail drawing available

Mandatory
6.

Method of Statement and Risk Assessment Available

Mandatory
7.

Calculation, if any, applicable in the proposed work

 
8.

Work Schedule

 
9.

Contractor site in charge contact number

 
10.

Contractor’s Indemnity Letter

 
11.

Duration (Job Completion)

 

NOTE: If any of the NOC Request Checklist is not fulfilled, your NOC Request will be REJECTED

Upload New Douments

Drag and Drop or Browse File

Maximum file size: 200MB

Allowed files: PDF, PNG, JPG

NOC Requests

For new NOC requests, please provide the required information in the following checklist:

Item Description Y N N/A Remarks
1.

NOC Required

(a) Engineering Phase
One-time issue
(b) Project Phase
Renewal basis

Mandatory
2.

Application Letter available along with Client letter

Mandatory
3.

M.O.G. Letter available

In case o
Non-SIPC
4.

Chainage and Alignment details available

 
5.

Proposed Construction / Modification / Crossing detail drawing available

Mandatory
6.

Method of Statement and Risk Assessment Available

Mandatory
7.

Calculation, if any, applicable in the proposed work

 
8.

Work Schedule

 
9.

Contractor site in charge contact number

 
10.

Contractor’s Indemnity Letter

 
11.

Duration (Job Completion)

 
12.

Previous Orpic NOC Letter (Reference No. to be attached)

   

NOTE: If any of the NOC Request Checklist is not fulfilled, your NOC Request will be REJECTED

Upload New Douments

Drag and Drop or Browse File

Maximum file size: 200MB

Allowed files: PDF, PNG, JPG